J.C General Trading Co.
Team Fores Mimarlik
AarHuss Mimarlık
Kuwait City
Turnkey Lump-Sum Contract
4 Weeks
224 m²
J.C General Trading Management Office
The project at hand encompasses the design and construction of a 1,200 sq. meter logistic company management office. Our scope of work includes the determination of the property type and style, creation of a functional layout plan, selection and implementation of design inspirations for furniture and lighting, and the utilization of materials to enhance the overall aesthetic. With consideration given to the distinct requirements of both white and blue-collar employees, we have designed specific areas within the office to accommodate these needs. Our aim is to infuse the space with both beauty and energy, drawing inspiration from the surrounding environment to inform the color scheme and furnishings. The layout plan has been crafted with a focus on optimal utilization of space, and has been designed to ensure efficient and effective functioning of the office. The placement of desks, meeting rooms, and common areas has been carefully considered to provide all employees with easy access to the resources they need. The furniture and celling design selected will bring a modern and sophisticated touch to the space, complementing its overall aesthetic. In conclusion, our objective is to deliver a functional, aesthetically pleasing, and inspiring workspace for the management team of the logistic company. The careful selection of natural materials, thoughtful design, and attention to detail will ensure that this office space is a desirable place to work.
More...In the office where we undertook the turnkey Fit-Out project for 3 weeks, we made infrastructure and installation controls after the site survey and exploration we carried out in the first stage. We made the project ready for implementation by clarifying the concept visuals, material and application details from the designer. When it came to detailed planning, we created a business plan by taking into account the Torun Center working hours and rules as well as material procurement and production times. Then we completed the demolition and dismantling works by protecting the existing coatings. We revised the electrical-data infrastructure according to the placement and dimensions of the new furniture. We made coatings suitable for the new design and repaired the existing floor. At the end of the process, we finalized the electrical-data connections and institutions and delivered the office after the final controls.
More...J.C General Trading Co.
Team Fores Mimarlik
AarHuss Mimarlık
Kuwait City
Turnkey Lump-Sum Contract
4 Weeks
224 m²
J.C General Trading Management Office